EV charging
EV charging, designed, installed and supported by one team.
Level 2 and DC fast charging for fleets, workplaces, dealerships, multifamily and public sites. We plan the site, handle the utility and permits, install and commission the chargers, and keep them running.
Get a quoteFree Energy SnapshotWho it is for
Fleets
Depot charging sized to your routes and shifts.
Workplaces and campuses
Charging for employees and visitors.
Auto dealerships
Charging that meets brand programs, for sales and service.
Multifamily
Resident charging with billing and load management.
Retail and hospitality
Charging that brings customers and guests in.
Public sector
Charging for public fleets and public sites.
Scope
What we do
- ✓ Site assessment and load study
- ✓ Charger selection: Level 2 and DC fast
- ✓ Electrical design, permits and inspections
- ✓ Utility coordination and service upgrades
- ✓ Civil work, trenching and ADA compliance
- ✓ Network setup, payments and charge management software
- ✓ Commissioning, monitoring and maintenance
Why Maxari
- ✓ One accountable team from assessment to switch-on
- ✓ Licensed electricians and EVITP-certified EV installers
- ✓ We handle permits, inspections and the utility
- ✓ We find the incentives, rebates, tax credits and grants that apply
How it works
Free Energy Snapshot or site walk
We review your bills and your site.
Design and quote
Engineering, equipment and a fixed scope.
Permits and build
We handle permits, the utility and the install.
Switch-on and support
Commissioning, training, monitoring and maintenance.
Proof
Work we have delivered
bp pulse · Harris County, TX
21-site Level 2 and Level 3 installation for the Harris County Sheriff and maintenance fleet.
Auto dealership groups
Level 2 and Level 3 charging installed and commissioned across Texas, Louisiana, Oklahoma and New Mexico.
NASA
Level 2 installations and grid resiliency support at multiple sites.
National multi-site rollout
Site assessments and turnkey installation for 500 to 1,000 sites nationwide.
See more on our projects page.
Questions
How long does a project take?
It depends on the site, the utility and permits. We give you a timeline with the quote.
Level 2 or DC fast?
Level 2 suits vehicles parked for hours. DC fast suits quick turnarounds. We recommend the mix from how your vehicles are used.
Which incentives apply?
It depends on your location and site type. We check federal, state and utility programs for you.
Who maintains the chargers?
We can monitor and maintain them after switch-on.
Get a quote
Get an EV charging quote
We reply within one business day. Fields marked * are required.